PERIPHERAL PORT ENGINE BUILDING
Starting with the front plate, notice the port is blocked with Devcon Blue Ceramic Putty
Mark Balkissoon and Kam Harduwar install the front rotor and eccentric shaft. All of the preparation work was done by Cliff Francis.
The front rotor housing is then installed, the middle plate added then the rear rotor and housing are installed.
Then the apex seals are installed. Notice on the rotor housings the size of the peripheral intake ports!
The rear plate is then installed and the tension bolts torqued!
|
|
|
|