ABR
2011 EVENTS
ABR FUND RAISING
2009 RACE RESULTS
ABR SPONSORS
BFGOODRICH R1 TIRES!
1ST GEN PROJECT
WHAT WE CAN DO
INTERIORS
P.PORT ENGINE BUILDING
MOTORSPORTS PRODUCTS
Internet Links
e-mail me

 

PERIPHERAL PORT ENGINE BUILDING

end plate.jpg

Starting with the front plate, notice the port is blocked with Devcon Blue Ceramic Putty
mark installs rotor and shaft.jpg

Mark Balkissoon and Kam Harduwar install the front rotor and eccentric shaft. All of the preparation work was done by Cliff Francis.

rear housing installed.jpg

The front rotor housing is then installed, the middle plate added then the rear rotor and housing are installed.

front housing installed.jpg

Then the apex seals are installed. Notice on the rotor housings the size of the peripheral intake ports!

tension bolts.jpg

The rear plate is then installed and the tension bolts torqued!